国产精品久久久久久久久电影网|欧美性猛交xxxx乱大交极品|野花在线无码视频在线播放|无遮挡日本h熟肉动漫在线观看

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
永久免费av无码网站性色av| 国产精品乱码一区二区三| 精品国产一区二区三区四区阿崩| 手机av男人天堂免费网址| 欧美双人家庭影院| 亚洲美女高清aⅴ视频免费| 国产suv精品一区二区五| 国内精品无码一区二区三区| 日日猛噜噜狠狠扒开双腿小说| 人人妻人人澡人人爽久久av | 波多野结衣爽到高潮大喷| 后入到高潮免费观看| 浪荡女天天不停挨cao日常视频| 色琪琪丁香婷婷综合久久| 人妻无码一区二区视频| 欧洲无码一区二区三区在线观看 | 伊人久久大线影院首页| 日本大片在线看黄a∨免费| 国产av天堂无码一区二区三区| 99久久久精品免费观看国产| 色又黄又爽18禁免费视频| 男女肉粗暴进来动态图| 色综合久久中文字幕无码| 九九在线中文字幕无码| 国产无遮挡a片又黄又爽| 国自产拍偷拍精品啪啪一区二区| 亚洲精品一区二区三区大桥未久| 久久婷婷五月综合色99啪| 国产亚洲精品精品国产亚洲综合| 亚洲av极品视觉盛宴| 性一交一乱一伧国产女士spa| 国产精品sp调教打屁股| 在线播放国产不卡免费视频| 中文有码亚洲制服av片| 无套内内射视频网站| 米奇影院888奇米色99在线| 久久国产精品一区二区| 99久久综合狠狠综合久久| 少妇饥渴偷公乱av在线观看涩爱| 无码国产福利av私拍| 亚洲精品动漫免费二区|